:
:
:2000-02-07
:181
: ;
;
6.5
3.5
2.0
47.0%

2017/2018
CT 2 3T +/-
/ % / % / % / %
12 12 35 5.8/16.3 37.5 4.9/10.5 0.5 0.9/5.8 0.2 2.1/3.0 0.6 2.3 4.0 6.3 1.9 3.5 3.0 0.3 0.6 1.6 2.8 -3.0 14.7 12.0
12 12 419.46 70/195 37.5 59/126 0.5 11/69 0.2 25/36 0.6 27 48 75 23 42 36 4 7 19 34 -36 176 144
2018/2019
CT 2 3T +/-
/ % / % / % / %
23 21 29 3.8/10.6 39.2 3.0/6.5 0.5 0.9/4.1 0.2 1.5/1.9 0.7 2.0 3.9 6.0 2.7 2.6 2.9 0.2 0.6 1.7 2.1 0.0 10.0 11.8
23 21 662.50 88/244 39.2 68/150 0.5 20/94 0.2 34/43 0.7 47 90 137 61 60 67 5 13 38 48 0 230 271
2019/2020
CT 2 3T +/-
/ % / % / % / %
2 1 19 2.5/5.5 47.0 2.0/3.5 0.8 0.5/2.0 0.2 1.0/1.5 0.8 1.0 2.5 3.5 2.0 3.5 1.5 1.0 0.0 1.0 1.0 13.0 6.5 7.5
2 1 38.00 5/11 47.0 4/7 0.8 1/4 0.2 2/3 0.8 2 5 7 4 7 3 2 0 2 2 26 13 15
CT 2 3T +/-
/ % / % / % / %
37 34 30 4.4/12.2 39.1 3.5/7.6 0.5 0.9/4.5 0.2 1.6/2.2 0.7 2.1 3.9 5.9 2.4 2.9 2.9 0.3 0.5 1.6 2.3 -0.3 11.3 11.6
37 34 1119.96 163/450 39.1 131/283 0.5 32/167 0.2 61/82 0.7 76 143 219 88 109 106 11 20 59 84 -10 419 430



* % () 2 2
3 3
/ / (C)